River Falls, WI · East Twin Cities Metro Mon–Fri 8a–5p · Sat by appt Owner-operated · Veteran-friendly (715) 307-8302

VCT & Vinyl Floor Refinishing · Farmington, MN · Est. 2003

VCT & Vinyl Floor Refinishing in Farmington, Minnesota.

Farmington is a Dakota County city south of Lakeville and west of Hastings, sitting along the Vermillion River. Historic small-town core with significant 1990s-2010s suburban growth. About 60 minutes west of River Falls via I-35 then east. VCT and vinyl floor refinishing for Farmington schools, clinics, offices and retail. We strip the old wax, neutralize the floor, and put down one coat that holds for years instead of months.

1 Coat Not three or four coats of acrylic
3-5YR Between coats Manufacturer rating in normal traffic
4-5HRS To foot traffic Cut overnight, open in the morning
0 Buffing No burnisher, no spray buff, no pads

Why we stopped recommending wax in Farmington

Why one coat outlasts four coats of wax.

Acrylic floor finish is a sacrificial layer. It is designed to be walked off, buffed back, and replaced, which is why the maintenance schedule around it never ends. A water-based urethane is not sacrificial. It cures into a hard film that resists the traffic and the cleaning chemicals instead of giving way to them.

Acrylic Wax The program most commercial floors are on
  • Three or four coats, then it starts dulling. The finish begins losing its gloss in traffic areas within weeks, which is why buffing exists in the first place.
  • Buffed or burnished on a weekly to monthly cycle. That is a machine on site, pads to buy, and custodial hours that come out of everything else.
  • Stripped and recoated every 6 to 18 months. Retail entrances and hospital corridors often run quarterly.
  • Sanitizers break it down. Quaternary disinfectants used in clinical and food areas attack acrylic directly, which shortens the cycle further in exactly the rooms that get cleaned most.
  • Buffing puts particulate in the air. It is the reason floor work gets scheduled around occupancy.
EPIC Water-Based Urethane What we put down instead
  • One coat, rated 3 to 5 years. No topping up, no second application a month later.
  • No buffing and no burnishing at all. The gloss is in the cured film, not in a layer that has to be polished back up.
  • Daily cleaning is a dust mop and water. An auto-scrubber with a microfiber pad when the floor needs more than that.
  • Holds up to the cleaners that destroy acrylic. Tested against bleach, hand sanitizer, motor oil, vinegar and food acids.
  • Low VOC and low odor. 46 g/L in gloss, 25 in matte, so it can go down in an occupied building overnight.

The 6-step job

What the work looks like in Farmington.

The same sequence on every floor, whether it is a clinic corridor or a school cafeteria.

  1. Walk the floor

    We look at what is actually on the slab. Layers of old acrylic, previous urethane, tile condition, seams, and the rooms that get the real traffic. This is also where the schedule gets set, because most of this work happens after hours or over a break.
  2. Strip the old finish

    Stripper goes down and dwells, then the floor is machine scrubbed in two directions with a slow-speed rotary. Edges, corners and door frames get scraped and hand worked, because that is where old wax builds up and where a missed patch shows later.
  3. Extract and neutralize

    All the slurry comes up with a wet vacuum, then the floor gets a citric acid scrub to bring it back to neutral. We pH test before going any further. Coating over a floor that is still alkaline is the most common reason a finish lets go.
  4. Check the conditions

    Air temperature, relative humidity, floor temperature and dew point all get read and recorded before anything is mixed. Humidity above 70 percent stops the job. In a heated building through winter this is rarely a problem; in August it sometimes means running dehumidifiers first.
  5. Coat the floor

    Two technicians work together, one spreading and one back-rolling behind, because the working window is measured in minutes and a coat that sets unevenly shows every stop and start. Traction additive is mixed in at this stage if the floor needs a higher slip rating.
  6. Hand it back

    The area stays closed while it dries, with the time it will be ready posted on the door. Foot traffic goes back on in 4 to 5 hours on the fast formula. We go over the new cleaning routine with whoever maintains the floor, because it is simpler than what they were doing and old habits will damage it.

Farmington questions

Common questions for Farmington homeowners.

Do you actually drive out to Farmington from River Falls?
Yes, Farmington is a regular install territory for us, even at 60 minutes. We batch Farmington jobs with Lakeville, Apple Valley, Rosemount, and other south-metro installs to make the drive worthwhile. Same install quality, same 15-year warranty, same prices as closer cities. Lead time runs 2-3 weeks out from quote because we wait until we have multiple south-metro jobs lined up.
Are downtown Farmington historic homes near Vermillion Falls different to install in?
Yes, those slabs are 100+ years old. Multiple prior coatings, settlement cracks from a century of freeze-thaw, surface damage from old riverside-town drainage patterns. Diamond grinding removes whatever's there and the polyurea system bonds reliably to clean substrate. Plan on 1.5-2 days vs the 1-day install typical for newer subdivisions.
Can you do basement coatings near the Vermillion River?
Yes, with moisture testing first. Homes within a few blocks of the Vermillion River or Spring Lake sometimes pull more humidity through their below-grade slabs. We run a calcium chloride MVER on every Farmington basement before quoting. Most slabs clear for standard polyurea; some get a moisture-mitigation primer first.
What does it cost compared to stripping and waxing?
Two things move the number: the square footage, and how much old acrylic has to come off before we can coat. A floor with years of wax build-up takes far longer to prep than one that was stripped last summer, and prep is most of the labor on this job. We walk the floor and give you a fixed written number before any work starts. The comparison worth making is not against one strip-and-wax visit, it is against every strip, every buff and every recoat you would pay for over the next five years.
How long is the floor out of service?
Foot traffic goes back on 4 to 5 hours after the coat goes down on the fast formula, or 8 hours on the slower one. In practice that means an area cut in the evening is open the next morning. Larger floors get split into sections so no part of the building closes for a full day.
Does this work on LVT, sheet vinyl and linoleum too?
Yes, all of them, along with VCT. Linoleum has one difference worth knowing: abrasive screens are never used on it during prep, because they will damage the surface. It comes up with stripper and pads instead, which takes a little longer on a heavily built-up floor.
What happens to daily cleaning afterward?
It gets simpler. Dust mop, then damp mop with plain water or a neutral cleaner. An auto-scrubber with a microfiber pad on the larger open areas when it needs more than that. What has to stop is anything that adds a layer back on top: no acrylic-enhancing cleaners, no products meant to be buffed or burnished afterward, and no burnisher.
Can it be done while the building is occupied?
The area being coated has to be closed off and stay closed until it is dry, but the rest of the building keeps running. The finish is low odor and low VOC, which is why this work gets done overnight in hospitals and clinics rather than during a shutdown.
What happens when it eventually wears?
Worn areas get sanded and recoated in place, which is a much smaller job than a full refinish because there is no wax to strip. Wear shows up first in doorways, main traffic lanes, and under furniture missing its floor protectors. A spot repair handles those without touching the rest of the floor.
Will it be slippery?
The gloss finish tests at 0.51 dry coefficient of friction and the matte at 0.9. Where a floor needs more than that, a traction additive is mixed into the coating, which raises the slip rating and the abrasion resistance together. Kitchens, entries, restrooms and pool surrounds usually get it.
Gloss or matte?
Gloss reads brighter and is what most corridors, cafeterias and retail floors get. Matte hides scuffing better and looks right on tile and in rooms where a shine would be out of place. They cannot be mixed to make a satin finish; that is done by adding aggregate to either one.

More in Farmington

All the services we offer in Farmington, MN.

Buildings rarely have one floor type. If the corridors are VCT and the entry is terrazzo and the restrooms are tile, all three can be done on the same visit.

VCT & Vinyl Floor Refinishing elsewhere

VCT & Vinyl Floor Refinishing in nearby cities.

Commercial floor refinishing in nearby cities.

← See VCT & Vinyl Floor Refinishing details and full service area

Get a quote

Ready for a vct & vinyl floor refinishing install in Farmington?

Commercial floor refinishing in Farmington and the surrounding metro.

  • Free on-site measurement
FREE QUOTE

Tell us about the floor.

Text Dave (fastest) Call