River Falls, WI · East Twin Cities Metro Mon–Fri 8a–5p · Sat by appt Owner-operated · Veteran-friendly (715) 307-8302

Commercial floor finishing · Twin Cities Metro · Est. 2003

Commercial floor finishing over the floor you already have.

VCT, terrazzo, tile and grout, and concrete all take the same finish: one coat of EPIC water-based urethane, applied over the floor that is in the building now. It replaces the strip-and-wax program rather than the floor. It is rated for 3 to 5 years, it is never buffed or burnished, and after it goes down daily cleaning is a dust mop and water. Start with the floor you have.

What floor is it

Four floors, one finish.

Each of these has its own page, because the prep is what differs. What comes off first, how the surface is neutralized, and what has to be tested before anything is coated all change with the floor. The coat that goes on at the end is the same one.

1 Coat Over the existing floor, nothing removed
3-5YR Between coats Manufacturer rating in normal traffic
4-5HRS To foot traffic Cut overnight, open in the morning
0 Buffing No burnisher, no spray buff, no pads

When this work gets done

Winter is the best condition of the year for it.

This finish will not cure above 70 percent relative humidity, and the floor has to sit at least 5 degrees above the dew point. Those two numbers decide the calendar, and in Minnesota they point at the months most floor work avoids.

Why the heating season suits it

Once air at 10 degrees outside is warmed to 70 indoors, the relative humidity in the building collapses. Heated interiors here commonly run 15 to 25 percent through the winter, and buildings that actively humidify still sit around 30 to 40. Every one of those readings is comfortably inside the limit. August is the hard month, when a humid building takes dehumidifiers running before anything can be mixed.

How the year falls for a building

Fall is when floors get looked at and budgeted, because the work happens months later. Winter break is the biggest window outside summer: two weeks of an empty school with the driest air of the year in it. January and February are the retail reset and the slowest weeks a restaurant has. Spring picks up what the winter breaks could not fit. A floor being talked about in September is usually a floor being coated in December.

The rest of the building keeps running

The area being coated has to be closed off and stay closed until it is dry, but nothing else stops. Corridors get done in sections, restrooms one at a time, and foot traffic returns in 4 to 5 hours on the fast formula. The finish is low odor and low VOC, 46 g/L in gloss and 25 in matte, which is why this work goes into occupied clinics and restaurants overnight instead of waiting for a shutdown.

Buildings we work in

Most buildings have several of these floors.

A school with terrazzo in the lobby has VCT down the classroom wings and tile in the restrooms. All of it can be done on the same visit, and the walk-through covers the whole building rather than one room.

Schools and districts

Classrooms and corridors are almost always VCT, the cafeteria and the main lobby are often terrazzo in anything built before the 1980s, and the restrooms and locker rooms are tile. Terrazzo in particular has usually been under acrylic so long that nobody in the building has seen what it actually looks like. Winter break and spring break are the windows, and they get scheduled months out.

Clinics, hospitals and senior living

Corridors, patient rooms and therapy areas are VCT or LVT; restrooms, shower rooms and soiled utility are tile and grout. These buildings have the shortest recoat cycles of anywhere, and the reason is chemical rather than traffic: the quaternary disinfectants used in clinical areas break acrylic finish down directly, so the rooms that get cleaned hardest are the rooms that dull first. A urethane finish is not attacked the same way.

Restaurants, kitchens and taprooms

The kitchen and the restrooms are tile and grout, and the dining room is usually VCT or sealed concrete. Grout is what gets these looked at: it holds mop water, it holds what the kitchen puts on the floor, and it is what a health inspector notices. January and February are the weeks with the room to do it.

Churches, civic buildings and municipal

Narthex and lobby floors in older buildings are frequently terrazzo, the fellowship hall or community room is VCT, and the restrooms are tile. These are the buildings most likely to have been quoted a grind and polish on a floor that only needs the wax taken off it. Weekdays are the window, and the sanctuary calendar sets the rest.

Offices, retail and light industrial

Sales floors, showrooms and breakrooms are often polished or sealed concrete, with VCT through the back of house. Where forklifts, pallet jacks or vehicles run, this finish is the wrong product and the polyurea system on our commercial floor coatings page is the right one. A building with both gets both, and we will say which line goes where on the walk.

Get a quote

Start with a walk-through of the building.

Tell us the building and what floors are in it. We will walk them, tell you what is actually on each one, and put a fixed written price in front of you. Where a floor needs something other than this finish, whether that is grinding, regrouting or a polyurea coating, you will hear that on the walk rather than after.

  • Free on-site measurement
FREE QUOTE

Tell us about the building.

Text Dave (fastest) Call